Sulphur Pit Refurbishment
Murrin Murrin, WA
MATERIALS USED
Metz Epoxy Primer
Metz Viton® Coating / Membrane Fluoroelastomer Coating Membrane
Metz-Sauereisen 54SG Structural Grade Acid Proof Concrete
Metz-Sauereisen 35 Chemical Resistant Castable
Metz Viton® Caulk
PROJECT SUMMARY
The Client required a suitable material that would withstand the corrosive sulphur pit environment, yet would offer the shortest curing period & installation timeframe. Metz Sauereisen 54SG had already been proven and utilised in a repair to this pit many years ago and due to its ability to be installed in a short timeframe and full cure in 2 days, it was an obvious choice over brickwork.
A Metz supervisor assisted the on-site civil contractor with both practical experience & technical support.